TAURUS 60S 7MW combined cycle plant


Qty
Item #
TAURUS 60S CHP Japan
Description
Images
Downloads

Description

Used SOLAR TURBINES TAURUS 60S 7 MW Combined cycle plant

Description

please click on images on the right for additional pictures

Used SOLAR TURBINES TAURUS 60S   7 MW Combined cycle plant for sale

Location Japan
2001

Solar Taurus60S  4970kw (Packaged by Mitsui Zosen)

  Natural gas burning  with gas compressor.
 Maintenance Details:  
Manufacturer's Maintenance :  Every year May, Aug, and December
  for the boiler, steam turbine, and gas compressor
  Absorption Filter Regular Maintenance (Once a year)
The package total about 63,000 hrs
Engine hrs 24,000 since last replacement in 2010 
                   
   

Generator 50Hz(Shinko ),6600kv

GENERATOR PART  : SHINKO   FSLK-AF-1100 6000KW  6600VO 50HZ 1500 ROPM 4 POLE
3PHASE 
MAX. OUT PUT  7480KW
EXITING UNIT OUTPUT 36KW
   VOLTAGE  80VOLT
   CURRENCY  450AMP
    BRUSHLESS EXTING TYPE  
   EXITING VOLT  50V,  CURRENCY 6.5 AMP
   YEAR 2000 DEC. 
GENERATOR WEIGHT 16.3 TON
                    GENERATOR   SHINKO  FSLK-AF-1100 6MW  6600V

  
HRSG :
10t/h MIURA HEAT RECOVERY BOILER NATURAL CIRCULATION WATER PIPE BOILER(OUT DOOR TYPE)
MAX. STEAM CAPACITY  10.2 T./HOUR
MAX. USING PRESSURE 2,350 KPA (GAGE PRESSURE)
MAX. .USING TEMPERATURE  425 DEG.C (HEATER)
                               253 DEG.C(STEAM UNIT, 
       
Steam turbine generator 
1940kw( Alsthom)
MITSUI ALSTOM STEAM TURBINE  CD3.7
1970KW  (O DEG.C)
  MAIN INLET PRESSURE 1.86 MPA(GAGE PRESSURE)
MAIN INLET TEMPERATURE 345DEG.C
EXHAUST  PRESSURE 4.9KPaA(FIXED PRESURE)
RPM  10920 RPM
FIRST CRITICAL SPEED 4300 RPM
2ND CRITICAL SPEED 21000 RPM
TURING DIRECTION CLOCK TURN FROM HIGH PRESSURE
PRODUCTION YEAR  2001 MAY
WEIGHT  5000 KGS
     
Gas Booster compressor.
GAS COMPRESSOR  HOWDEN NO. JOO595
HYDRAULIC TEST PRESSURE 42.  BAR.G
MAX. WORKING PRESSURE  HIGH SIDE 24.1 BAR.G
                            LOW SIDE 5.5 BAR.G
MAX. SPEED         4500 RPM
  Absorption chiller for GT intake air cooling