TAURUS 60 5.65MW WHRB
please click on images on the right for additional pictures
| Name of Equipment |
Technical Specification |
Year of Manufacture | Warranty | Installation year |
| Gas Turbine | GAS TURBINE GENERATOR PACKAGE WITH GAS/HSD DUAL FUEL STANDARD COMBUSTER SYSTEM. |
2007 | Out of Warranty | 2009 |
| MAKE-TUMO TURBOMACH | ||||
| MODEL-TBM T60 | ||||
| CAP-5.65 MW | ||||
| Gas Compressor |
Make-Enerprojecta SA Energy Technology |
2008 | Out of Warranty | 2009 |
| Model/Type-EGS-S-100/300 | ||||
| Medium-Natural Gas | ||||
| Nominal flow rate at nominal condition/Suction flow-2200NM3/HR(880 m3/hr) |
||||
| WHR Boiler | MAKE-CHITAR VESSELS LIMITED. |
2008 | Out of Warranty | 2010 |
| Type of Boiler : Water Tube, Natural Circulation | ||||
| Steam Generation : 12600 kg/hr @ 100 Deg C F & A |
||||
| Working Pressure : 10 kg/cm2 |
||||
| Centrifuge for HSD | Make – Alfalaval | 2009 | Out of Warranty | Still not installed |
| Model-MAB206 |